Aktobe, Bokenbay Batyr str. 2,
BC«Dastan Center», 6-7 floor

Environmental protection

Environmental protection measures carried out:

The main measures to reduce the negative impact on the environment during work are:

  • application of the best available technologies
  • providing facilities with backup equipment and materials, which will allow work to be completed in a timely manner and will ensure a quick response when the risk of emergency situations arises. The wellheads of all wells are checked monthly in accordance with the agreement with the AkBeren State Enterprise. No technical faults found;
  • movement of vehicles along certain routes. The section “Field roads” has been developed. in the working design of the field development during trial operation. Natural roads on the territory of the field have been eliminated;
  • all work is carried out strictly within the area of ​​the allocated land allotment, including storage of materials and waste;
  • strict adherence to adopted technical and technological solutions;
  • organization of a system for collection, transportation and disposal of all types of waste;
  • Technical and biological reclamation upon completion of work. According to the reclamation projects, upon completion of the work, the reclamation of disturbed lands will be carried out.

Construction of access roads with improved coverage to places of production work